Homes and villas
System sizing based on annual consumption, usable roof area, shading and planned loads such as heat pumps or electric vehicles.
Turuncu Solar · Regional Solar Service
Rooftop and ground-mounted solar plant installation in Muğla. With 3,040 hours of sunshine it is one of Türkiye's highest-potential provinces. Turnkey installation in Fethiye, Bodrum and Marmaris.

Applications
System sizing based on annual consumption, usable roof area, shading and planned loads such as heat pumps or electric vehicles.
Self-consumption-oriented rooftop solar solutions for hotels, workshops, warehouses, offices and retail facilities.
Project-specific on-grid, hybrid or off-grid assessment for irrigation, cold storage and remote sites.
Engineering review
Consumption, the building, electrical infrastructure and site conditions are evaluated together before a binding proposal is prepared.
Monthly and hourly consumption patterns are assessed together with expected solar production.
Usable area, orientation, pitch, shading, structural capacity, waterproofing and safe maintenance access are checked.
Temperature, wind, humidity, corrosion exposure, snow load and dust are considered for the selected location.
Metering, switchboards, grounding, protection equipment and current grid-connection requirements are verified for the project.
Service area
A recent electricity bill, the consumption address, intended use and available roof photographs are enough for the initial assessment.
Decision guides
Frequently asked questions
We first review a recent electricity bill, the consumption address, intended use and available roof or land information. Final capacity is confirmed after a site survey.
The estimate uses coordinates, panel orientation and tilt, shading, temperature, equipment efficiency and system losses to calculate monthly and annual generation.
Installed capacity, roof type, equipment, mounting structure, cable distances, switchboard work, access conditions and project scope differ for every site.
No. Storage is assessed when backup during outages, night-time use or grid-independent operation is required.
Project-specific assessment