Hybrid + Battery
Ankara · Turkey
Project credentials
1.1 MWInstalled capacity
830k kWhAnnual production
620 tCO₂ reduction
5.2yPayback
Project note
Ankara Ticari Kompleks Depolamalı Hibrit is a 1.1 MW Hybrid + Battery installation in the Ankara region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets 830k kWh annual production with high savings (≈%92) and measurable carbon reduction.
Components used
PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX
BatteryBYD Battery-Box Premium HVS