Skip to main content
Skip to content
Bodrum · Turkey

Project credentials

5,40 kWp / 5 kWhInstalled capacity
Annual production
0 tCO₂ reduction
Payback

Project note

Aydoğan GES is a 5,40 kWp / 5 kWh Depolamalı Sistem installation in the Bodrum region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.

Components used

PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX

Tags

Depolamalı SistemBodrum5,40 kWp / 5 kWhSavings —
Request a similar project →