Hybrid + Battery
Bursa · Turkey
Project credentials
2.4 MWInstalled capacity
1.8M kWhAnnual production
1,350 tCO₂ reduction
4.2yPayback
Project note
Bursa Lojistik Merkezi Hibrit GES is a 2.4 MW Hybrid + Battery installation in the Bursa region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets 1.8M kWh annual production with high savings (≈%94) and measurable carbon reduction.
Components used
PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX
BatteryBYD Battery-Box Premium HVS