Skip to main content
Skip to content
‹ References2026 · Solar with Storage
Battery Storage System

Çetinkaya GES

Bodrum · Turkey

Project credentials

25,6 kWp / 30,7 kWhInstalled capacity
Annual production
0 tCO₂ reduction
Payback

Project note

Çetinkaya GES is a 25,6 kWp / 30,7 kWh Battery Storage System installation in the Bodrum region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.

Gallery

Tags

Solar with StorageBattery Storage SystemBodrum25,6 kWp / 30,7 kWhSavings —
View all references →