Depolamalı Sistem
Bodrum · Turkey
Project credentials
25,6 kWp / 30,7 kWhInstalled capacity
—Annual production
0 tCO₂ reduction
—Payback
Project note
Çetinkaya GES is a 25,6 kWp / 30,7 kWh Depolamalı Sistem installation in the Bodrum region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.
Components used
PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX