Off-Grid
Konya · Turkey
Project credentials
780 kWInstalled capacity
620k kWhAnnual production
465 tCO₂ reduction
4.0yPayback
Project note
Konya Tarım İşletmesi Sulama GES is a 780 kW Off-Grid installation in the Konya region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets 620k kWh annual production with high savings (≈%100) and measurable carbon reduction.
Components used
PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX