Skip to main content
Skip to content
Bodrum · Turkey

Project credentials

40,50 kWpInstalled capacity
Annual production
0 tCO₂ reduction
Payback

Project note

Baki Kayan GES is a 40,50 kWp On-Grid installation in the Bodrum region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.

Components used

PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX

Tags

On-GridBodrum40,50 kWpSavings —
Request a similar project →