Project credentials

74,7 kWpInstalled capacity
Annual production
0 tCO₂ reduction
Payback

Project note

Bodrum Mesken GES is a 74,7 kWp On-Grid installation in the Muğla region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.

Components used

PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX

Tags

On-GridMuğla74,7 kWpSavings —