Project credentials
74,7 kWpInstalled capacity
—Annual production
0 tCO₂ reduction
—Payback
Project note
Bodrum Mesken GES is a 74,7 kWp On-Grid installation in the Muğla region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.
Components used
PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX